Capability 02
System & Board Engineering
The board is where a good architecture becomes real hardware — and where a bad one becomes an expensive re-spin. SION owns architecture, component selection, BOM, schematic, layout, bring-up and integration as one continuous activity.
- Scope
- System architecture, component selection, BOM development and procurement, schematic capture, PCB design, bring-up, hardware integration
- Typical entry point
- A new board, a re-spin caused by obsolescence, or a design inherited from a team with no bandwidth to take it to production
What this covers
A BOM you can still buy in ten years
Board design for a long-life program is not primarily a routing problem. It is a sourcing and lifecycle problem that happens to involve routing. Every part choice is a commitment: to a package, to a supplier, to a temperature grade and to an availability window that may close long before the platform is retired.
SION selects components with availability, second-sourcing and lifecycle in mind, flags single-source parts before layout rather than after, and builds the BOM as a controlled artefact that manufacturing and obsolescence management will keep using for years. Where a part is already at end-of-life, the change is designed in deliberately rather than discovered at the last scheduled build.
Bring-up is treated as an engineering stage, not a formality. A board arrives with a documented bring-up sequence — power sequencing first, then clocking, then each interface in dependency order — so the first power-on produces a known state rather than a list of unknowns.
01System architecture
Power tree, clock domains, interface topology, thermal path, mechanical envelope and grounding strategy — written down before any netlist exists, and agreed with the silicon and firmware leads.
02Component selection and BOM
Part selection against electrical, thermal and lifecycle requirements, with second-source analysis, temperature-grade decisions and a BOM structure that manufacturing can carry forward.
03Procurement coordination
Long-lead identification, distributor and supplier liaison, sample orders for bring-up, and honesty about which parts will constrain the prototype schedule.
04Schematic capture and review
Structured schematic capture with design-rule and peer review, pinout and power checks against the silicon documentation, and a review record that names who signed off what.
05PCB design and layout
Stack-up definition, controlled-impedance routing, high-speed and mixed-signal separation, thermal copper, EMC-conscious placement, and fabrication and assembly outputs with a documented revision.
06Bring-up and hardware integration
Staged first power-on, measurement against the power and clock budget, interface bring-up in dependency order, fault isolation, and rework of prototype issues where the fix is a wire rather than a re-spin.
Program mechanics
Customer inputs, engineering deliverables and acceptance criteria
Board programs vary widely in starting point — a blank sheet, a failing design, or a working prototype that needs productising. The inputs and deliverables below are the baseline, adjusted per program.
Customer inputs
- System requirements, interface definitions and connector or form-factor constraints
- Mechanical envelope, mounting, cooling and environmental conditions
- Input power source and its realistic behaviour, including transients
- Existing schematics, BOMs or vendor reference designs where a re-spin is involved
- Volume expectations and the procurement model — build quantity, preferred distributors
- Any standards or customer procedures the board must be designed and tested against
Engineering deliverables
- Architecture and interface document
- Power tree, clock plan, interface map and grounding approach.
- Controlled BOM
- Part numbers, alternates, lifecycle status and long-lead notes.
- Schematic set
- Released revision with review record and design-rule checks.
- Fabrication and assembly package
- Stack-up, Gerbers, drill, pick-and-place, assembly drawings.
- Bring-up report
- Measured power rail behaviour, clock verification and interface results, with issues and dispositions.
- Integration notes
- What firmware needs to know, and where the remaining risk sits.
Typical acceptance criteria
- Every net functional at bring-up, or a documented, dispositioned exception list
- Power rails within the tolerances the devices specify, measured and recorded
- Controlled-impedance and high-speed nets characterised against the stack-up assumptions
- Fabrication and assembly outputs pass the fabricator's and assembler's DFM review
- BOM has no single-source line without an agreed mitigation
- Board operates through the agreed thermal range on the bench before it leaves for environmental test
On figures. SION does not publish layer counts, trace rates, channel counts or measured board results for customer work. Where a figure matters to your evaluation, request it against a specific program and we will provide it with the conditions of measurement.
Where this connects
Related capabilities, disciplines and industries
Adjacent capabilities
All capabilitiesProgram inquiry
Bring us your requirements.
If you have a board that will not come up, a design facing an obsolescence problem, or a clean sheet with a fixed enclosure, start with the constraint and we will scope from there.